Viae | Road Map | Pictures
A Chorobate was used to ensure a construction was level. This tool was over 10' ft. long. Water poured into the long groove running down the middle of the top of the Chorobate indicated when it was "level".
See Also
  • Groma, Hodometer, Vitruvius
  • Back to Construction

    Copyright © 2014, KET Webmaster